LAPORAN PENGELUARAN KAS PEMBANGUNAN MASJID NURUL KAROMAH

No.   Tanggal   Uraian Volume Satuan Harga Nilai Kumulative
1 2024-05-31 Total Pembelian Material Tahap 1 1,00 497.248.273,00 497.248.273,00 497.248.273,00
2 2024-06-10 Bambu 100,00 Batang 14.000,00 1.400.000,00 498.648.273,00
3 2024-06-10 Paku 7 CM 10,00 KG 20.000,00 200.000,00 498.848.273,00
4 2024-06-10 Paku 10 CM 10,00 KG 20.000,00 200.000,00 499.048.273,00
5 2024-06-10 Kaso 4 X 6 3,00 Ikat 155.000,00 465.000,00 499.513.273,00
6 2024-06-10 Besi Lulir 16 mm 48,00 Batang 184.300,00 8.846.400,00 508.359.673,00
7 2024-06-10 Besi Lulir 13 mm 24,00 Batang 120.000,00 2.880.000,00 511.239.673,00
8 2024-06-10 Bendrat 20,00 KG 14.000,00 280.000,00 511.519.673,00
9 2024-06-10 Tips Penurunan Besi 1,00 Orang 25.000,00 25.000,00 511.544.673,00
10 2024-06-12 Pipa 1 Inc 7,00 Kg 14.800,00 103.600,00 511.648.273,00
11 2024-06-12 Jasa potong besi kunci 1,00 Biji 50.000,00 50.000,00 511.698.273,00
12 2024-06-15 Pipa Rucika 3 In 3,00 Batang 195.000,00 585.000,00 512.283.273,00
13 2024-06-15 Mata kating 1,00 Dus 100.000,00 100.000,00 512.383.273,00
14 2024-06-15 Kawat Las 1,00 Dus 85.000,00 85.000,00 512.468.273,00
15 2024-06-15 Besi Polos 8 Full 40,00 Batang 45.504,00 1.820.160,00 514.288.433,00
16 2024-06-15 Bayar Tukang dan Kenek 5,00 Hari 330.000,00 1.650.000,00 515.938.433,00
17 2024-06-16 Bayar Pak Nana Bantu tukang 1,00 Orang 200.000,00 200.000,00 516.138.433,00
18 2024-06-23 Bayar Pak Nana Bantu tukang 4,00 Orang 50.000,00 200.000,00 516.338.433,00
19 2024-06-26 Beli Triplek 48,00 Lembar 135.000,00 6.480.000,00 522.818.433,00
20 2024-06-26 Tips Penurunan Triplek 1,00 Orang 20.000,00 20.000,00 522.838.433,00
21 2024-06-27 Kaso 4 X 6 192,00 Batang 36.000,00 6.912.000,00 529.750.433,00
22 2024-06-27 Kaso 4 X 6 4,00 Ikat 150.000,00 600.000,00 530.350.433,00
23 2024-06-27 Paku 4 Cm 4,00 KG 25.000,00 100.000,00 530.450.433,00
24 2024-06-27 Tips Pengiriman Kayu 1,00 Orang 20.000,00 20.000,00 530.470.433,00
25 2024-06-30 Beli kopi buat tukang 1,00 Pack 50.000,00 50.000,00 530.520.433,00
26 2024-06-30 Beli skrup gypsum 3,00 Box 85.000,00 255.000,00 530.775.433,00
27 2024-06-30 Beli mata skrup 1,00 Pcs 15.000,00 15.000,00 530.790.433,00
28 2024-06-30 Beli benang 3,00 Pcs 5.000,00 15.000,00 530.805.433,00
29 2024-06-30 Bayar tukang dan kenek 9,00 Hari 330.000,00 2.970.000,00 533.775.433,00
30 2024-07-01 Beli kaso 4x6 cm 5,00 Ikat 150.000,00 750.000,00 534.525.433,00
31 2024-07-01 Tips nurunin kaso 1,00 Kali 10.000,00 10.000,00 534.535.433,00
32 2024-07-02 Bayar pak Nana bantu tukang 4,00 Hari 50.000,00 200.000,00 534.735.433,00
33 2024-07-02 Konsumsi tukang 7 hari 7,00 Hari 15.000,00 105.000,00 534.840.433,00
34 2024-07-04 Beli paku beton 7 cm 2,00 Dus 30.000,00 60.000,00 534.900.433,00
35 2024-07-04 Beli paku 4 cm 1,00 Kg 20.000,00 20.000,00 534.920.433,00
36 2024-07-05 Pembuatan spanduk Pembangunan Masjid 3,00 Pcs 162.666,67 488.000,00 535.408.433,00
37 2024-07-06 Beli sekrup 5 L 4,00 Kg 80.000,00 320.000,00 535.728.433,00
38 2024-07-06 Beli paku 4 cm 1/2 kg 0,50 Kg 30.000,00 15.000,00 535.743.433,00
39 2024-07-06 Konsumsi kerja bakti Pembangunan Masjid 1,00 Hari 50.000,00 50.000,00 535.793.433,00
40 2024-07-06 Bayar pak Nana bantu tukang 7,00 Hari 50.000,00 350.000,00 536.143.433,00
41 2024-07-07 Bayar tukang dan kenek 5,00 Hari 330.000,00 1.650.000,00 537.793.433,00
42 2024-07-10 Beli pralon rucika 3/4 inch 4,00 Batang 45.000,00 180.000,00 537.973.433,00
43 2024-07-10 Beli keni 3/4 inch 2,00 Buah 5.000,00 10.000,00 537.983.433,00
44 2024-07-12 Beli paku 7 cm 5,00 Kg 20.000,00 100.000,00 538.083.433,00
45 2024-07-12 Beli paku 5 cm 2,00 Kg 20.000,00 40.000,00 538.123.433,00
46 2024-07-13 Beli kaso 4x6 cm 16,00 Ikat 150.000,00 2.400.000,00 540.523.433,00
47 2024-07-13 Beli kaso 4x6 cm 18,00 Batang 36.000,00 648.000,00 541.171.433,00
48 2024-07-13 Beli paku 5 cm 5,00 Kg 20.000,00 100.000,00 541.271.433,00
49 2024-07-14 Beli kopi buat tukang 1,00 Kali 77.500,00 77.500,00 541.348.933,00
50 2024-07-14 Bayar kenek 5,00 Hari 195.000,00 975.000,00 542.323.933,00
51 2024-07-14 Bayar pak Nana bantu tukang 5,00 Hari 50.000,00 250.000,00 542.573.933,00
52 2024-07-21 Konsumsi kerja bakti 1,00 Hari 50.000,00 50.000,00 542.623.933,00
53 2024-07-21 Beli mata bor beton 1,00 Pcs 20.000,00 20.000,00 542.643.933,00
54 2024-07-21 Beli skrup 1,00 Dus 65.000,00 65.000,00 542.708.933,00
55 2024-07-21 Bayar pak Nana bantu tukang 3,00 Hari 50.000,00 150.000,00 542.858.933,00
56 2024-07-21 Bayar kenek 2 orang 3,50 Hari 300.000,00 1.050.000,00 543.908.933,00
57 2024-07-26 Beli lem beton 5,00 Botol 60.900,00 304.500,00 544.213.433,00
58 2024-07-26 Beli beton cor 10,00 Kubik 812.000,00 8.120.000,00 552.333.433,00
59 2024-07-26 Bayar tukang 8,50 Hari 180.000,00 1.530.000,00 553.863.433,00
60 2024-07-26 Bayar kenek 4,00 Hari 150.000,00 600.000,00 554.463.433,00
61 2024-07-27 Beli gorengan 1,00 Kali 50.000,00 50.000,00 554.513.433,00
62 2024-07-27 Beli kopi kapal api, indocafe, rokok dan gula pasir 1,00 Kali 293.000,00 293.000,00 554.806.433,00
63 2024-07-27 Beli pasir 0,75 Kijang 126.666,67 95.000,00 554.901.433,00
64 2024-07-27 Tips material 1,00 Kali 10.000,00 10.000,00 554.911.433,00
65 2024-07-27 Beli es teh 2,00 Teko 50.000,00 100.000,00 555.011.433,00
66 2024-07-27 Beli nasi 22,00 Bungkus 15.000,00 330.000,00 555.341.433,00
67 2024-08-04 Beli mata bor skrup 5,00 Pcs 10.000,00 50.000,00 555.391.433,00
68 2024-08-04 Konsumsi kerja bakti copot papan cor tiang 1,00 Hari 336.500,00 336.500,00 555.727.933,00
69 2024-08-09 Beli pasir 1/4 mobil buat nutup tembok atas 0,25 Mobil 400.000,00 100.000,00 555.827.933,00
70 2024-08-09 Beli hebel 20 pcs buat nutup tembok atas 20,00 Pcs 6.000,00 120.000,00 555.947.933,00
71 2024-08-09 Bayar tukang 1 hari buat nutup tembok atas 1,00 Hari 180.000,00 180.000,00 556.127.933,00
72 2024-10-18 Konsumsi Rapat Pembangunan 1,00 Kali 95.000,00 95.000,00 556.222.933,00
73 2024-10-19 Cetak Proposal Pembangunan 3,00 Bendel 35.000,00 105.000,00 556.327.933,00
74 2024-10-27 Konsumsi rapat pembangunan 1,00 Kali 114.000,00 114.000,00 556.441.933,00
75 2024-11-02 Konsumsi rapat pembangunan 1,00 Kali 96.000,00 96.000,00 556.537.933,00
76 2024-11-04 Besi Polos 8 Full 80,00 Batang 53.000,00 4.240.000,00 560.777.933,00
77 2024-11-04 Mata kating 1,00 Dus 70.000,00 70.000,00 560.847.933,00
78 2024-11-10 Bayar tukang 6 hari 6,00 Hari 200.000,00 1.200.000,00 562.047.933,00
79 2024-11-10 Bayar kenek 5 hari 5,00 Hari 150.000,00 750.000,00 562.797.933,00
80 2024-11-14 Bayar tukang 5 hari 5,00 Hari 200.000,00 1.000.000,00 563.797.933,00
81 2024-11-14 Bayar kenek 5 hari 5,00 Hari 150.000,00 750.000,00 564.547.933,00
82 2024-11-15 Beli kopi buat tukang 1,00 Kali 100.000,00 100.000,00 564.647.933,00
83 2024-11-15 Beli paku beton 7 Cm 2 Kg 2,00 Kg 65.000,00 130.000,00 564.777.933,00
84 2024-11-15 Beli besi ulir 16 mm full 40 batang 40,00 Batang 213.000,00 8.520.000,00 573.297.933,00
85 2024-11-15 Beli besi ulir 13 mm full 40 batang 40,00 Batang 136.000,00 5.440.000,00 578.737.933,00
86 2024-11-15 Beli kunci besi 1,00 Pcs 65.000,00 65.000,00 578.802.933,00
87 2024-11-16 Konsumsi kerja bakti 1,00 Kali 80.000,00 80.000,00 578.882.933,00
88 2024-11-17 Konsumsi kerja bakti 1,00 Kali 150.000,00 150.000,00 579.032.933,00
89 2024-11-17 Beli bambu 100 batang 100,00 Batang 17.500,00 1.750.000,00 580.782.933,00
90 2024-11-23 Konsumsi kerja bakti iket besi 1,00 Kali 100.000,00 100.000,00 580.882.933,00
91 2024-11-24 Konsumsi kerja bakti 1,00 Kali 120.000,00 120.000,00 581.002.933,00
92 2024-11-26 Bayar Tukang 7 Hari 7,00 Hari 200.000,00 1.400.000,00 582.402.933,00
93 2024-11-26 Bayar Kenek 6 Hari 6,00 Hari 150.000,00 900.000,00 583.302.933,00
94 2024-11-26 Beli Kawat 12 Kg 12,00 Kg 23.000,00 276.000,00 583.578.933,00
95 2024-11-26 Beli Paku Beton 7 Cm 1 Dus 1,00 Dus 65.000,00 65.000,00 583.643.933,00
96 2024-11-26 Beli Kikir Baco 1 Buah 1,00 Buah 45.000,00 45.000,00 583.688.933,00
97 2024-11-27 Konsumsi kerja bakti 1,00 Kali 75.000,00 75.000,00 583.763.933,00
98 2024-11-30 Bayar tukang 6 hari 6,00 Hari 200.000,00 1.200.000,00 584.963.933,00
99 2024-11-30 Bayar kenek 5 hari 5,00 Hari 150.000,00 750.000,00 585.713.933,00
100 2024-11-30 Konsumsi kerja bakti 1,00 Kali 50.000,00 50.000,00 585.763.933,00
101 2024-12-01 Konsumsi kerja bakti 1,00 Kali 82.000,00 82.000,00 585.845.933,00
102 2024-12-01 Konsumsi tukang dan kerja bakti warung Safa 1,00 Kali 502.000,00 502.000,00 586.347.933,00
103 2024-12-08 Konsumsi kerja bakti 1,00 Kali 121.000,00 121.000,00 586.468.933,00
104 2024-12-08 Bayar tukang 3 hari 3,00 Hari 200.000,00 600.000,00 587.068.933,00
105 2024-12-08 Bayar kenek 2 hari 2,00 Hari 150.000,00 300.000,00 587.368.933,00
106 2024-12-08 Sewa mobil pak Nasir buat angkut hebel 1,00 Kali 200.000,00 200.000,00 587.568.933,00
107 2024-12-12 Beli bambu 50 batang + tips 50,00 Batang 18.000,00 900.000,00 588.468.933,00
108 2024-12-12 Beli minum dan cemilan kerja bakti 1,00 Kali 100.000,00 100.000,00 588.568.933,00
109 2024-12-14 Buat Spanduk Pembangunan Masjid 1,00 Pcs 165.000,00 165.000,00 588.733.933,00
110 2024-12-15 Bayar Tukang 7 Hari 7,00 Hari 200.000,00 1.400.000,00 590.133.933,00
111 2024-12-15 Bayar Kenek 5 Hari 5,00 Hari 150.000,00 750.000,00 590.883.933,00
112 2024-12-21 Tips nurunin kaso 1,00 Kali 30.000,00 30.000,00 590.913.933,00
113 2024-12-21 Bayar tukang 7 hari 7,00 Hari 200.000,00 1.400.000,00 592.313.933,00
114 2024-12-21 Bayar kenek 6 hari 6,00 Hari 150.000,00 900.000,00 593.213.933,00
115 2024-12-22 Konsumsi Kerja Bakti 1,00 Kali 154.000,00 154.000,00 593.367.933,00
116 2024-12-22 Beli paku 10 cm 1 Kg 1,00 Kg 20.000,00 20.000,00 593.387.933,00
117 2024-12-22 Beli kawat 1 Kg 1,00 Kg 20.000,00 20.000,00 593.407.933,00
118 2024-12-25 Konsumsi kerja bakti 1,00 Kali 99.000,00 99.000,00 593.506.933,00
119 2024-12-25 Konsumsi rapat pembangunan 1,00 Kali 101.000,00 101.000,00 593.607.933,00
120 2024-12-27 Pembayaran bondek 6 mm 15 lembar (belanja 20.12.24) 15,00 Lembar 630.000,00 9.450.000,00 603.057.933,00
121 2024-12-27 Bayar pemesanan konsumsi untuk kerja bakti cor 28.12.24 (Makan, kue dan Esteh) 1,00 Kali 600.000,00 600.000,00 603.657.933,00
122 2024-12-27 Bayar Tukang 3 Hari 3,00 Hari 200.000,00 600.000,00 604.257.933,00
123 2024-12-27 Konsumsi rapat 1,00 Kali 60.000,00 60.000,00 604.317.933,00
124 2024-12-27 Bayar air dan kopi tukang di warung Safa 1,00 Kali 198.000,00 198.000,00 604.515.933,00
125 2024-12-27 Bayar pompa beton 1,00 Hari 3.000.000,00 3.000.000,00 607.515.933,00
126 2024-12-27 Bayar Beton Cor 12 Kubik 12,00 Kubik 825.000,00 9.900.000,00 617.415.933,00
127 2024-12-28 Tambah beli konsumsi kerja bakti ngecor (nasi, minuman) 1,00 Kali 135.000,00 135.000,00 617.550.933,00
128 2024-12-28 Tambah beli beton cor 3 kubik 3,00 Kubik 825.000,00 2.475.000,00 620.025.933,00
129 2024-12-28 Bayar kenek 5 orang 1 hari 1,00 Hari 650.000,00 650.000,00 620.675.933,00
130 2024-12-28 Tips supir 3 mobil cor 3,00 Mobil 20.000,00 60.000,00 620.735.933,00
131 2024-12-28 Tips operator pompa beton 3 orang 3,00 Orang 200.000,00 600.000,00 621.335.933,00
132 2024-12-28 Tips mobil material 1,00 Kali 10.000,00 10.000,00 621.345.933,00
133 2024-12-29 Bayar konsumsi kerja bakti ngecor di warung Safa 1,00 Kali 353.000,00 353.000,00 621.698.933,00
134 2024-12-29 Konsumsi kerja bakti 1,00 Kali 60.000,00 60.000,00 621.758.933,00
135 2024-12-30 Bayar paku 7 Cm 5 Kg (belanja 20.12.24) 5,00 Kg 20.000,00 100.000,00 621.858.933,00
136 2024-12-30 Bayar paku 10 Cm 5 Kg (belanja 20.12.24) 5,00 Kg 20.000,00 100.000,00 621.958.933,00
137 2024-12-30 Bayar paku 4 Cm 3 Kg (belanja 20.12.24) 3,00 Kg 20.000,00 60.000,00 622.018.933,00
138 2024-12-30 Bayar kaso 4 x 6 Cm 45 batang (belanja 20.12.24) 45,00 Batang 40.000,00 1.800.000,00 623.818.933,00
139 2025-01-01 Konsumsi kerja bakti 1,00 Kali 80.000,00 80.000,00 623.898.933,00
140 2025-01-04 Bayar paku 10 cm 2 kg (belanja 20.12.24) 2,00 Kg 20.000,00 40.000,00 623.938.933,00
141 2025-01-04 Bayar paku 4 cm 1 kg (belanja 20.12.24) 1,00 Kg 20.000,00 20.000,00 623.958.933,00
142 2025-01-04 Bayar paku 5 cm 1 kg (belanja 20.12.24) 1,00 Kg 20.000,00 20.000,00 623.978.933,00
143 2025-01-04 Bayar kaso 4 x 6 Cm 25 batang (belanja 20.12.24) 25,00 Batang 40.000,00 1.000.000,00 624.978.933,00
144 2025-01-04 Bayar paku 7 Cm 1 Kg (belanja 20.12.24) 1,00 Kg 20.000,00 20.000,00 624.998.933,00
145 2025-01-04 Bayar kawat 1 Kg (belanja 20.12.24) 1,00 Kg 23.000,00 23.000,00 625.021.933,00
146 2025-01-04 Bayar paku 10 Cm 1 Kg (belanja 20.12.24) 1,00 Kg 20.000,00 20.000,00 625.041.933,00
147 2025-01-04 Bayar paku 7 Cm 0.5 Kg (belanja 20.12.24) 0,50 Kg 20.000,00 10.000,00 625.051.933,00
148 2025-01-04 Bayar paku 4 Cm 0.5 Kg (belanja 20.12.24) 0,50 Kg 20.000,00 10.000,00 625.061.933,00
149 2025-01-04 Bayar kabel jek 1 set (belanja 20.12.24) 1,00 Set 16.000,00 16.000,00 625.077.933,00
150 2025-01-04 Bayar plastik cor 1 rol (belanja 20.12.24) 1,00 Rol 130.000,00 130.000,00 625.207.933,00
151 2025-01-04 Bayar ember 10 Pcs (belanja 20.12.24) 10,00 Pcs 7.000,00 70.000,00 625.277.933,00
152 2025-01-04 Bayar sarung tangan 3 Lusin (belanja 20.12.24) 3,00 Lusin 25.000,00 75.000,00 625.352.933,00
153 2025-01-04 Bayar gosokan 2 Pcs (belanja 20.12.24) 2,00 Pcs 15.000,00 30.000,00 625.382.933,00
154 2025-01-04 Konsumsi kerja bakti 1,00 Kali 61.000,00 61.000,00 625.443.933,00
155 2025-01-05 Beli cemilan buat tukang 1,00 Kali 80.000,00 80.000,00 625.523.933,00
156 2025-01-05 Cetak proposal pembangunan 2 set (ke-1) 2,00 Set 32.000,00 64.000,00 625.587.933,00
157 2025-01-06 Bayar Tukang 7 Hari 7,00 Hari 200.000,00 1.400.000,00 626.987.933,00
158 2025-01-06 Bayar Kenek 7 Hari (Rapelan Minggu Lalu 2 Hari) 7,00 Hari 150.000,00 1.050.000,00 628.037.933,00
159 2025-01-06 Akomodasi pengambilan uang ke BJB 1,00 Kali 100.000,00 100.000,00 628.137.933,00
160 2025-01-06 Cetak Proposal Pembangunan Masjid 2 set (ke-2) 2,00 Set 25.000,00 50.000,00 628.187.933,00
161 2025-01-09 Pesan Stampel Panitia Pembangunan 2 Pcs 2,00 Pcs 60.000,00 120.000,00 628.307.933,00
162 2025-01-11 Pembayaran Tukang dari tanggal 7-12 jan 25 (6hr) 6,00 Hari 200.000,00 1.200.000,00 629.507.933,00
163 2025-01-11 Konsumsi kerja bakti 1,00 Kali 60.000,00 60.000,00 629.567.933,00
164 2025-01-11 Pembayaran kenek dari tanggal 07-12 jan 25 (6 hari) 6,00 Hari 150.000,00 900.000,00 630.467.933,00
165 2025-01-12 Beli mata bor beton 10 mm 1 pcs 1,00 Pcs 35.000,00 35.000,00 630.502.933,00
166 2025-01-12 Beli no drop 1 kg 1 kaleng 1,00 Kaleng 60.000,00 60.000,00 630.562.933,00
167 2025-01-12 Beli stop kran air 1 pcs 1,00 Pcs 15.000,00 15.000,00 630.577.933,00
168 2025-01-12 Beli knee 3/4 inch 1 pcs 1,00 Pcs 4.000,00 4.000,00 630.581.933,00
169 2025-01-12 Beli flow shock 3/4 inch 1 pcs 1,00 Pcs 4.000,00 4.000,00 630.585.933,00
170 2025-01-12 Beli dop 3/4 inch 1 pcs 1,00 Pcs 4.000,00 4.000,00 630.589.933,00
171 2025-01-12 Beli lem paralon 1 bungkus 1,00 Bungkus 8.000,00 8.000,00 630.597.933,00
172 2025-01-12 Beli porfic 1 botol 1,00 Botol 20.000,00 20.000,00 630.617.933,00
173 2025-01-13 Bayar backup kenek 1 hari 1,00 Hari 120.000,00 120.000,00 630.737.933,00
174 2025-01-13 Bayar air dan kopi tukang di warung Safa 1,00 Kali 185.000,00 185.000,00 630.922.933,00
175 2025-01-14 Bayar backup kenek 1 hari 1,00 Hari 150.000,00 150.000,00 631.072.933,00
176 2025-01-16 Pembayaran Material - gosokan 2 pcs 2,00 Pcs 15.000,00 30.000,00 631.102.933,00
177 2025-01-16 Pembayaran Material - benang 1 pcs 1,00 Pcs 5.000,00 5.000,00 631.107.933,00
178 2025-01-16 Pembayaran Material - pasir putih 0,50 Mobil 380.000,00 190.000,00 631.297.933,00
179 2025-01-16 Pembayaran Material - lakban 1,00 Pcs 17.000,00 17.000,00 631.314.933,00
180 2025-01-16 Pembayaran Material - kerekan 1,00 Pcs 45.000,00 45.000,00 631.359.933,00
181 2025-01-16 Pembayaran Material - Tambang 10,00 Meter 4.500,00 45.000,00 631.404.933,00
182 2025-01-16 Pembayaran Material - kawat 2,00 Kg 23.000,00 46.000,00 631.450.933,00
183 2025-01-16 Pembayaran Material - pipa 3 inchi 1,00 Meter 35.000,00 35.000,00 631.485.933,00
184 2025-01-16 Pembayaran Material - pasir putih 1,00 Mobil 370.000,00 370.000,00 631.855.933,00
185 2025-01-16 Pembayaran Material - kawat ayak 1,50 Meter 20.000,00 30.000,00 631.885.933,00
186 2025-01-16 Pembayaran Material - bata press 350,00 Pcs 648,57 227.000,00 632.112.933,00
187 2025-01-18 Pembelian konsumsi Tukang 1,00 Hari 30.000,00 30.000,00 632.142.933,00
188 2025-01-18 Pembayaran tips penurunan material 1,00 Orang 30.000,00 30.000,00 632.172.933,00
189 2025-01-18 Pembayaran Material - paku 5,00 Kg 20.000,00 100.000,00 632.272.933,00
190 2025-01-18 Pembayaran Material - kawat 5,00 Kg 23.000,00 115.000,00 632.387.933,00
191 2025-01-18 Pembayaran Material - gunting baja 1,00 Pcs 75.000,00 75.000,00 632.462.933,00
192 2025-01-18 Pembayaran Material - besi 7h 45,00 Batang 53.000,00 2.385.000,00 634.847.933,00
193 2025-01-18 Pembayaran Material - kating 10,00 Psc 4.500,00 45.000,00 634.892.933,00
194 2025-01-18 Pembayaran Material - benang 2,00 Meter 5.000,00 10.000,00 634.902.933,00
195 2025-01-18 Pembayaran Material - kawat 3,00 Kg 23.000,00 69.000,00 634.971.933,00
196 2025-01-18 Pembayaran Material - kayu galar 5*10 6,00 Batang 83.000,00 498.000,00 635.469.933,00
197 2025-01-18 Pembayaran Tukang 7 hari (13-19 jan 2025) 7,00 Hari 200.000,00 1.400.000,00 636.869.933,00
198 2025-01-18 Pembayaran kenek 4 hari (15 - 18 Jan 2025) 4,00 Hari 150.000,00 600.000,00 637.469.933,00
199 2025-01-18 Konsumsi Rapat Pembangunan Masjid 1,00 Pcs 380.000,00 380.000,00 637.849.933,00
200 2025-01-19 Pembayaran Kenek 1 hari minggu 1,00 Hari 150.000,00 150.000,00 637.999.933,00
201 2025-01-23 Pembayaran Tukang 4 hari (20-23 jan 2025) 4,00 Hari 200.000,00 800.000,00 638.799.933,00
202 2025-01-23 Pembayaran kenek 3 hari 3,00 Hari 150.000,00 450.000,00 639.249.933,00
203 2025-01-24 Pengeluaran uang rokok tukang perbaikan toren bang udin 1,00 Hari 50.000,00 50.000,00 639.299.933,00
204 2025-01-27 Pembelian kaleng 140 pcs 140,00 Pcs 3.500,00 490.000,00 639.789.933,00
205 2025-02-17 AQUADROP 1,00 1 kaleng 74.000,00 74.000,00 639.863.933,00
206 2025-02-17 LAKBAN SELANG AC 1,00 1 roll 15.000,00 15.000,00 639.878.933,00
207 2025-02-17 CLEM SELANG PIPA AC 1,00 1 pak 25.000,00 25.000,00 639.903.933,00
208 2025-02-17 CELENGAN 81,00 1 dus 3.500,00 283.500,00 640.187.433,00
209 2025-02-17 PLAMIR 1,00 1 kaleng 65.900,00 65.900,00 640.253.333,00
210 2025-02-17 ROll CAT KECIL 5,00 5 pcs 5.756,80 28.784,00 640.282.117,00
211 2025-02-17 NO DROP 20 KG 1,00 1 PAIL 920.000,00 920.000,00 641.202.117,00
212 2025-02-17 KOPI SAFA 1,00 4 renceng 68.000,00 68.000,00 641.270.117,00
213 2025-02-17 SNACK UNTUK RAPAT 1,00 1 PAKET 150.000,00 150.000,00 641.420.117,00
214 2025-02-17 LAMPU BUAT DALAM DAN LUAR 1,00 4 380.000,00 380.000,00 641.800.117,00
215 2025-02-17 ONGKOS CEK,BONGKAR PASANG LAMPU 1,00 5 150.000,00 150.000,00 641.950.117,00
216 2025-02-17 BESI PENUTUP GOT 1,00 7 1.123.000,00 1.123.000,00 643.073.117,00
217 2025-02-17 CAT BESI.KUAS.KENI.KRAN.T KRAN DLL 1,00 10 188.000,00 188.000,00 643.261.117,00
218 2025-02-18 NO DROP 20 KG 1,00 20 kg 920.000,00 920.000,00 644.181.117,00
219 2025-02-23 MAKANAN DAN MINUMAN KERJA BAKTI 1,00 10 146.000,00 146.000,00 644.327.117,00
220 2025-02-23 TUKANG 7 HARI 7,00 200 200.000,00 1.400.000,00 645.727.117,00
221 2025-02-23 DP PAK BASAR 1,00 1 500.000,00 500.000,00 646.227.117,00
222 2025-02-23 KOPI TUKANG 1,00 5 97.000,00 97.000,00 646.324.117,00
223 2025-02-23 KOPI TUKANG 1,00 5 97.000,00 97.000,00 646.421.117,00
224 2025-02-23 LIST PLAPON PVC 4,00 10 BATANG 125.000,00 500.000,00 646.921.117,00
225 2025-02-23 PITING LAMPU 1,00 1 74.000,00 74.000,00 646.995.117,00
226 2025-02-23 BIIKIN PROPOSAL 5,00 5 20.000,00 100.000,00 647.095.117,00
227 2025-02-23 BAYAR PAK BASAR 1,00 1 1.000.000,00 1.000.000,00 648.095.117,00
228 2025-02-24 Besi lampu depanbdan samping 1,00 1 348.000,00 348.000,00 648.443.117,00
229 2025-02-25 NO DROP 1,00 1 206.500,00 206.500,00 648.649.617,00
230 2025-02-25 Dinabol 10 in 20,00 1 2.500,00 50.000,00 648.699.617,00
231 2025-02-25 Dinabol 8 in 8,00 1 3.000,00 24.000,00 648.723.617,00
232 2025-02-26 Breket ac out dor 1,00 1 70.000,00 70.000,00 648.793.617,00
233 2025-02-26 Pembelian lampu 50 what 3 pcs 1,00 1 315.000,00 315.000,00 649.108.617,00
234 2025-02-26 Topi lampu dan piting 3 set 1,00 1 75.000,00 75.000,00 649.183.617,00
235 2025-02-26 Lampu 15 what 1,00 1 20.000,00 20.000,00 649.203.617,00
236 2025-02-27 KERAMIK KIA 50X50 1,00 1 86.500,00 86.500,00 649.290.117,00
237 2025-02-27 No drop 4 kg toko material acun 1,00 1 245.000,00 245.000,00 649.535.117,00
238 2025-02-27 BAYAR UPAH PA BASAR 1,00 1 500.000,00 500.000,00 650.035.117,00
239 2025-02-27 Roll kecil 1,00 3 21.000,00 21.000,00 650.056.117,00
240 2025-02-27 Konsumsi 2 hari kerja bakti dan tukang 1,00 1 90.000,00 90.000,00 650.146.117,00
241 2025-02-28 Bayar material tgl 7-1-25 1,00 1 3.969.000,00 3.969.000,00 654.115.117,00
242 2025-02-28 Bayar material tgl 15/1 2025 1,00 1 2.717.000,00 2.717.000,00 656.832.117,00
243 2025-02-28 Seleri pengecetan pak nana 1,00 1 500.000,00 500.000,00 657.332.117,00
244 2025-02-28 Upah 2 hari nasir 1,00 1 300.000,00 300.000,00 657.632.117,00
245 2025-03-02 Beli pipa dll 1,00 1 24.000,00 24.000,00 657.656.117,00
246 2025-03-02 No drop 4 kg 1,00 1 206.500,00 206.500,00 657.862.617,00
247 2025-03-10 Jilid proposal 10 jilid 1,00 1 50.000,00 50.000,00 657.912.617,00
248 2025-03-11 NO DROP 4 KG 3 KALENG 1,00 1 632.000,00 632.000,00 658.544.617,00
249 2025-03-13 BAYAR NOTA MATERIAL 20/1/25 1,00 1 1.020.500,00 1.020.500,00 659.565.117,00
250 2025-03-13 BAYAR NOTA MATERIAL 22/1/25 1,00 1 904.000,00 904.000,00 660.469.117,00
251 2025-03-13 BAYAR NOTA MATERIAL 6/2 25 1,00 1 494.000,00 494.000,00 660.963.117,00
252 2025-03-22 PEMBELIAN WERLESSS 1,00 1 200.000,00 200.000,00 661.163.117,00
253 2025-04-28 KEPERLUAN ATAP SEMENTARA 1,00 1 40.000.000,00 40.000.000,00 701.163.117,00
254 2025-04-30 Beli kopii tukang 1,00 1 96.500,00 96.500,00 701.259.617,00
255 2025-04-30 Bel bensin buat campuran cat 1,00 1 48.000,00 48.000,00 701.307.617,00
256 2025-05-01 Token listrik 200 1,00 1 202.500,00 202.500,00 701.510.117,00
257 2025-05-01 GEMBOK ATAS 1,00 1 50.000,00 50.000,00 701.560.117,00
258 2025-05-01 BELI BENSIN CAMPURAN CAT 1,00 1 50.000,00 50.000,00 701.610.117,00
259 2025-05-01 BELI CELENGAN 25PCS 1,00 1 108.625,00 108.625,00 701.718.742,00
260 2025-05-04 SERVIS AC 2 UNIT 1,00 1 250.000,00 250.000,00 701.968.742,00
T o t a l701.968.742,00
';
 MASJID NURUL KAROMAH MASIH DALAM TAHAP PEMBANGUNAN RENOVASI    PROGRESS PEMBANGUNAN MASJID BARU MENCAPAI 57,10%    PEMBANGUNAN MASJID MASIH MEMBUTUHKAN DONASI    DONASI BISA DITRANSFER KE BANK BSI No. Rekening 730-2138-766 A/N PEMBANGUNAN MASJID NURUL KAROMAH ATAU BANK BSI No. Rekening 730-2138-502 A/N DKM MASJID NURUL KAROMAH    DONASI JUGA BISA DISALURKAN MELALUI QRIS PJSP (PENYELENGGARA JASA SISTEM PEMBAYARAN)    DONASI JUGA BISA DISERAHKAN LANGSUNG KE KANTOR SEKRETARIAT DKM MASJID NURUL KAROMAH VILLA SAMUDRA JAYA, BEKASI